Owners Manual

Toll Free: 888.785.7320
www.PulseShowerSpas.com
Position mounting anges and mark hole locations.
For wood or solid backing applications drill 1/8” pilot holes through
shower wall into wood or metal stud.
NOTE: If wall is tiled, drill a 1/8” pilot hole through tile then change to the
a 5/16” diameter masonry tile drill bit.
WARNING:
BOTH ends of grab bar must
be installed into WOOD wall
studs
Rev.A
PARTS INCLUDED
• Stainless steel rail
• Mounting screws
• Washers
Once the ErgoSafetyBar is securely fastened to wall, align cover plate
locking tabs with slots in ange. Push cover against mounting until it locks.
STEP 1
STEP 2
STEP 3
INSTALLATION
PRODUCT DIMENSIONS
DETAIL MOUNTING INSTALLATION
Install screws through mounting ange and directly into wood/metal stud
or bracing. Use masonry anchors if necessary.
18”
12.5”
1.25”
3”