Specifications

EMC-CS-2009.1
© Copyright Ford Motor Company – All Rights Reserved Page 78 of 121
February 11, 2010
19.3 Test Procedures
Adjust DC offset of the signal generator/audio amplifier to 13.5 volts with the DUT disconnected (open circuit).
Prior to testing, measure and verify that the test waveforms A, B, C, D and E match those waveforms illustrated in
section 19.2. For waveform F, measure and verify that the test waveform voltages are similar to that illustrated in
Figure 19-6 and 19-7. All measurements shall be made with the DUT disconnected from the waveform generator.
Connect and activate the DUT. Verify that it is functioning correctly.
Except for waveform E, apply each waveform into each power supply and control circuit separately. Apply waveform
E simultaneously to all power circuits with direct battery connections.
Application of the waveforms shall be in accordance with the requirements delineated in Table 19-1. Monitor DUT
functions before and after application of each test waveform.
Repeat testing for all DUT operating modes listed in the test.