Specifications
EMC-CS-2009.1
© Copyright Ford Motor Company – All Rights Reserved Page 54 of 121
February 11, 2010
14.2 Test Verification and Test Setup
Verification shall be performed using the test Setup shown in Figures 14-2. Except where noted in Figure 14-2, the setup of
the DUT, Load Simulator and test harness is identical to that used for RI 130.
Figure 14-2: RI 150 Test Setup
2b
1000 -0/+25
7
10
1
2a
> 200 mm
8
11
6
12
9
**
4
5
+
_
3
4
4
5
+
_
3
4
8
11
12
6
9
Detail
Key
1 DUT 7 DUT Monitor/Support Equipment
2a DUT Circuit Wire to be Tested 8 Coupling Test Fixture
2b DUT Wire Harness 9 Amplifier ( 1kHz – 100 kHz )
3 Load Simulator 10 Ground Plane
4 Artificial Network 11 Digital Oscilloscope (1 GS/sec, 8 Mega sample)
5 Automotive Battery or linear power supply (Powers DUT and
Load Simulator)
12 Amplifier Load Resistance (e.g. 4 ohms)
6 Signal Generator ** Current Probe (> 10 MHz, 30 A) Example: Agilent N2783A