Installation Guide
3
Installation Instructions
Step 1
Step 2
Step 1
Step 2
Step 1
Step 2
1
2
Remove existing shower arm and shower head.
Slide escutcheon (5) onto nipple. Step 1: Place plumbers tape on shower
arm (1) threading. Step 2: Insert Oasis shower arm (2) into existing
plumbing and thread to secure. TIP: Use wrench to secure arm.
Thread showerhead (1) onto shower arm (2).
3
Tape
Glue
Back of handheld holder
Tape
Glue
Back of handheld holder
Step 1
Step 2
6
5
Once handshower holder (9) is secure, insert rubber washer (4) into both
ends of hose (7). Connect hex head end to swivel joint (6) and tapered
end to handshower (8). Place the tapered end of the hose into the
handshower holder (9).
Finished product
Apply glue to the handshower holder (9) as indicated and add tape
(included) to secure onto wall. Let it cure for 48 hours for complete result.
4
TIP