Installation Guide
4
Installation Instructions
Behind
wall stud
6 in.
2.5”
Step 1
Step 2
9”
Behind
wall stud
6 in.
2.5”
Step 1
Step 2
9”
1
2
3
Make sure the water supply (hot/cold) line is 6 inches
apart from the center of each pipe.
Make sure you leave a 9 inch by 2.5 inch rectangular
opening on your nished wall.
Step 1: Add plumber's tape to nipple as shown (shorter
end of the thread).
Step 2: Screw both nipples into your plumbing
Screw nuts onto nipple until the end is ushed with
the wall.
Slide trim into place to gure out positioning
BEFORE YOU BEGIN
Measure the following to ensure
your tub ller will t properly.
4