Installation Guide

4
Installation Instructions
Behind
wall stud
6 in.
2.5”
Step 1
Step 2
9”
Behind
wall stud
6 in.
2.5”
Step 1
Step 2
9”
1
2
3
Make sure the water supply (hot/cold) line is 6 inches
apart from the center of each pipe.
Make sure you leave a 9 inch by 2.5 inch rectangular
opening on your nished wall.
Step 1: Add plumber's tape to nipple as shown (shorter
end of the thread).
Step 2: Screw both nipples into your plumbing
Screw nuts onto nipple until the end is ushed with
the wall.
Slide trim into place to gure out positioning
BEFORE YOU BEGIN
Measure the following to ensure
your tub ller will t properly.
4