Installation Guide
3
Installation Instructions
Step 1
Step 2
Step 1
Step 2
Step 2
Step 1
Step 3
1
2
Remove existing shower arm and showerhead. 
Step 1: Slide escutcheon (3) onto nipple. Step 2: Place plumbers tape (9) 
on nipple threads. Step 3: Insert nipple into existing plumbing and  
thread to secure. TIP: Use wrench to secure arm and place in  
leveled vertical position.
Thread showerhead (1) onto shower arm (2). 
3
Tape
Glue
Back of handheld holder
Tape
Glue
Back of handheld holder
Step 2
Step 1
Step 3
6
5
Once handshower holder (8) is secure, insert rubber washer (11) into 
both ends of hose (6). Connect hex head end to swivel joint (5) and 
tapered end to handshower (7). Place the tapered end of the hose into 
the handshower holder (8).
Finished product.
Apply glue (10) to the handshower holder (8) as indicated and add tape 
(included) to secure onto wall. Let it cure for 48 hours for complete result.
4
TIP




