User Instructions
www.pulsar.pl   EN54C    RED POWER plus 
10 
4. Installation. 
4.1. Requirements. 
The PSU is to be mounted by a qualified installer, holding relevant permits and licenses (applicable and 
required for a given country) for ~230 V in and low-voltage installations.  
As the  power supply is designed for a continuous  operation and  is not equipped with a power-
switch, therefore, an appropriate overload protection in the power supply circuit should be  provided. Moreover, 
the  user  should  be  informed  how  to  disconnect  the  power  supply  unit  from  the  mains  supply  (usually  by 
assigning an appropriate fuse in the fuse box). One switch should only protect one power supply. The electrical 
system shall follow valid standards and regulations. The power supply should operate in a vertical position in 
order to provide free and convectional air flow through ventilating holes of the casing. 
As the PSU cyclically runs a periodic battery test, during which the resistance in the battery circuit is 
measured, pay attention to the proper connection of cables to the terminals. Installation cables should be firmly 
connected  to  the  battery  side  terminals  and  to  the  power  supply  connector.  If  necessary,  it  is  possible  to 
permanently disconnect the battery from the power supply systems by removing the F
BAT 
fuse. 
The side walls of the housing include the embossings, which should be used to carry out installation 
cables.  Use  a  blunt  instrument  to  make  an  opening  for  cable  gland  from  the  outside  of  the  housing.  Then, 
carefully mount the cable gland, protecting the PSU from water penetration, in the opening.  
Fig. 4. The method of forming an opening for cable gland. 
The PSU is fitted with PG9 and PG11 cable glands. Gland size should be chosen depending on the 
cross-section of the cable. Single cable gland can be used for only one wire.  
Fig. 5. Recommended types and sections of installation cables PG9 and PG11 for cable glands. 










