6. Start Up Instructions
6.1 Overview
Once all electrical connections have been made, your DLC is ready for Start-up. The following 9 sections
detail the procedures required to complete a DLC start up.
WHEN POWER IS SUPPLIED TO THE UNIT, LINE VOLTAGE IS PRESENT ON THE FIELD WIRING
BOARD LOCATED AT THE BACK OF THE UNIT EVEN WHEN THE MOTOR IS OFF.
DURING START-UP, IT IS NECESSARY TO RUN THE PUMP MOTOR. THIS WILL CAUSE FLUID TO
DISCHARGE FROM THE PUMP. YOU ARE RESPONSIBLE FOR SAFELY DIVERTING FLOW FROM THE
PUMP DURING START-UP AND CALIBRATION.
6.1.1 User Interface Familiarization.
There are four key elements that will be useful in starting-up the DLC:
a) Display
b) Keypad
c) Manual Adjustment Knob
d) Pump Motor.
Refer to Figure 12 to familiarize yourself with the location of these items before proceeding.
Figure 12. Key DLC start-up elements.