Manual

17
6. Start Up Instructions
6.1 Overview
Once all electrical connections have been made, your DLC-XP/RC is ready for Start-up. This can be
completed in 9 simple steps.
WHEN POWER IS SUPPLIED TO THE UNIT, LINE VOLTAGE IS PRESENT ON THE FIELD WIRING
BOARDS OF BOTH THE DLC-XP AND DLC-RC EVEN WHEN THE MOTOR IS OFF.
Figure 12 – Key DLC–XP/RC start-up elements
DURING START-UP, IT IS NECESSARY TO START THE PUMP MOTOR. THIS WILL CAUSE FLUID TO
DISCHARGE FROM THE PUMP
. THE USER IS RESPONSIBLE FOR SAFELY DIVERTING FLOW FROM
THE PUMP DURING START
-UP AND CALIBRATION.
Display
Keypad
Pump Motor
DLC-XP
Serial Number Tag
Wiring Cover
Conduit Adaptor
DLC-RC