Troubleshooting guide

5
5. Installation and Wiring
5.1 Location
Review the Safety section (pg 3) prior to installing the MPC. It contains information required to
properly install and operate the MPC in an industrial environment.
The site selected for the installation of your MPC is largely dependent on that of the metering pump.
Review the Installation, Operation, and Maintenance manual provided with your metering pump. It
details system related issues that are important to proper operation of the pump. Consider the following
MPC related issues when selecting a site. Avoid locations where the MPC would be subjected to
extreme cold or heat. Note the warning statement on the next page. The installation of this device must
comply with national, state and local codes.
The MPC controller must be secured to an appropriate support before use. Use four 3/8” bolts or
anchors to secure the MPC controller and pump to a fixed base. No assembly is required for the MPC
controller itself.
Figure 1 – Typical Installation.