6. To Ensure a Smooth and Successful Installation, You Should:
1) Have electrical work to comply with latest national electrical
code, national fire code, and all applicable local codes and
ordinances.
2) Coordinate with other trades to avoid interference.
3) Verify existing conditions on the site and coordinate with owner
side to ensure necessary utilities available.
4) Copy all related plans, specifications, shop drawings and
attachments to schedule and coordinate related work.
5) Thoroughly review the project to ensure that all jobs should
meet or exceed the above requirements. Contact with the
CCTV Project Coordinator to draw attention in case alleged
discrepancies occur.