Technical data

-
23
Figure 24 Figure 25
9) Fixes the support on the wall (Figure 26)
10) Fixes the dome to the support above
Figure 26
11) System pilot wire after (Figure 27 ) marking meets, after the
electricity then controlled the ball machine for the system on.
RED CONNECTOR
(POWER IN)
BLACK CONNECTOR
(RS485 CONTROL IN
)
VIDEO OUT
RED LINE(AC24V IN)
BLACK LINE(AC24V IN)
ORANGE LINE(RS485+)
YELLOW LINE(RS485-)
Figure 27
5. The step of outside dome installs:
1) Unpacking the carton and carefully take out the dome
camera and its attachments.
2) takes out the support, fixes the support in the wall goes against