Owner's Manual
Operation Guide
4865 Sterling Drive, Boulder, CO 80301 Operation Guide
PH: 1 (800) PSAUDIO service@psaudio.com www.psaudio.com 15-056-11-1
Rev B©2021 PS Audio Inc. All rights reserved.
DirectStream Power Plant 15
®
10
Setup
Outlets
Delay Mode
Pressing the right arrow pulls up the next menu of the Setup section.
The P15 has a lot of outlets. 10 total in the US version, (other regions will have dierent amounts as
outlet sizes vary). The outlets are grouped into Zones that can be personalized to t your specic
system requirements.
The Power Plant 15 allows for six dierent power sequencing options. The default
setting for all zones is SWITCHED. All of these selections are only activated by the front-panel
power button.
1. SWITCHED: As the front-panel power button is engaged, any zone set to SWITCHED will
power up with no delay, and power down with a three-second delay.
2. DELAYED: As the front-panel power button is engaged, any zone set to DELAYED will
power up with a three-second delay, and power down with a zero-second delay.
3. PROGRAMMED: As the front-panel power button is engaged, any zone set to
PROGRAMMED will power up with a delay in the number of seconds desired, as well as
power down with a delay in the number of seconds desired.
4. REBOOT: As the front-panel power button is powered down, any zone set to REBOOT
will power down accordingly, and will after a three-second delay power back on. This mode is
independent of the front power button.