Vardo & Huxton Timber Suites Pryzm 750 & 1000 Instructions for installation and use Patent pending UK Registered Design R3 Nov 2020 601227_2 1
Contents Tech Specs What’s in the Box Installation – Timber Maintenance 3 4 5-7 7 601227_2 2
Technical Specification Dimensions Fire/Surround Description 57” VARDO PRYZM 5D 1000 53” VARDO PRYZM 5D 750 47” VARDO PRYZM 5D 750 51” HUXTON PRYZM 5D 1000 41” HUXTON PRYZM 5D 750 Timber Wall mounted & floor standing: with optional plinth Logs A B C D 4 LRG 1320mm 810 / 609 mm 277mm 1450mm 4 SML 1220mm 810 / 609 mm 277mm 1350mm 4 SML 1070mm 810 / 609 mm 277mm 1200mm 4 LRG 1154mm 588mm 277mm 1284mm 4 SML 904mm 588mm 277mm 1034mm Timber Wall mounted Fire Visible Flame Area
What’s in the box(s) Installation Booklet x2 Pre-installed Fire 750 1000 or Wall Bracket – Suite support bracket (x1) Attached to the back of the fire Screws (x2) Batteries (x2) AAA Mantle Hooks (x2) Logs 4 Logs Located under the surround or in the leg of surround (dependent on model) Timber only Remote control Where applicable Timber Plinth supplied separately Cams, Pins and Dowels x7 601227_2 x4 4
Installation - Timber This is a 2 adult person lift. Do not attempt to lift from the centre of the top panel, lift from under the hearth and underside of the trim as shown below. Diagram 1 1. Remove Rear Bracket Unpack your new suite and remove the rear wall mount bracket which has been screwed to the rear of the fire for transit. See Diagram 1. Note: Please discard the screws 2.
Installation – Timber continued (Huxton Model Shown) Diagram 3 (all dimension in mm) Note: Mantel hooks must be fitted for both floor standing and wall mounted models. 1. Measure from the underside of the hearth to the bottom of the L- bracket fitted on either side of the fire surround and make a note of this dimension. X detailed on Diagram 3. 2. Measure the internal distance between the surround body and make a note of this dimension. Y detailed on Diagram 3. 3.
Installation – Timber continued 5. Assemble the plinth For the floor standing suite installation. The base plinth will need to be unpacked and assembled. The base plinth comprises of four main parts which should be built up and fixed together with the provided 7-off cam fixings and 4-off dowels (see Diagram 6). Once assembled the base plinth can be positioned centrally under the suite to complete the floor standing suite installation.