- Prozone Ozone/Salt Chlorinator Owner's Manual

3
PARTS LISTING
Description Part Number Number in kit
CSS10 Box 7S10T-42IA-P19 1
Salt Generator Bracket 202199 1
Salt Generator Cell 600211 1
Saddle Clamp Assembly 201155 2
Injector 600002 1
Plastic Clamp (black) 20185 4
¾” Metal Hose clamp 20067 4
¼” Braided Hose 20260 120 inches
¼” Braided Hose
(Cell Maintenance) 20260 24 inches
¾” Clear Hose 20264 120 inches
Check Valve (1/4” by ¼”) 20214 1
White ½” by 3” PVC Pipe 20314 1
Gasket, Saddle Clamp 400078 2
Gasket, Saddle Clamp, Barb 400076 2
Gasket, Saddle Foot 400018 4
ADDITIONAL SAFETY INSTRUCTIONS
NOTE: When the Pump system is shut down you must also shut down the Salt Generator System.
1. Your CSS-10 must be installed in accordance with the installation instructions and the Figures/Diagrams provided in this manual.
2. To have both your Pump system, and the CSS-10 operate properly together as a unit you should wire the two systems together.
3. The Salt Cell MUST be mounted vertically.
4. Use only the power cord (DC Voltage) provided with the Ozonator/Salt Generator System to power up the Salt Cell.
IMPORTANT NOTES:
Salt Level Testing:
1. You should test the salt level of your pool before calculating the salt requirement.
2. If a Salt test is not performed you may find later that too much salt will have been added - the Chlorinator may not perform as intended.
3. If the pool has been treated with other forms of Chlorine – for instance Sodium Chloride – you may already have salt content
General:
1. Always balance the pH, total Alkalinity and Calcium hardness, otherwise corrosive or scaly conditions may result, which will lead to equipment
inefficiency or damage. Unbalanced water may cause staining and mineral deposits, chlorine effectiveness may decrease, and bathers may
experience discomfort.
2. Regular testing of the pool waters is recommended. A Free Chlorine level of 0.5ppm (parts per million) to 1.5ppm should be maintained.
3. DO NOT USE Copper or Bromine based Algaecide products in your pool when the CSS-10 is installed.
4. Prozone recommends the pool pump and Salt Generator (see safety note above), for a minimum of 8 to 12 hours a day. Actual run time
will be affected by the chlorine demand from the environment or bathers.
7. WARNING: Always disconnect automatic pool cleaners before adding salt which must be fully dissolved before turning on the
pool cleaner.
8. Plaster Pools: Do not start system until plaster has set for two weeks.
9. WARNING: Baquacil (Biguanide Pools) must be drained and refilled with fresh water prior to using the CSS-10.
10. Read the entire Owner’s Manual. Additional advice can be obtained from a pool installation professional or from a Prozone sales representative
(sales@prozoneint.com) or visit our website at www.prozoneint.com.