Specifications

Installation and Initialization Tsunami MP.11 5012-SUR Installation and Management
Installation Procedure
22
Step 6: Tighten Band Clamps/Secure Ethernet Cable
1. Using a 5/16” nutdriver or a screwdriver, fully tighten both band clamps (maximum torque 50 kg-cm/3.6 lbf-ft).
2. Secure Ethernet cable to the pole with cable ties. Provide some slack between the unit and the first cable tie, which
should be within 12 inches of the unit. Continue to secure cable with cable ties at 3-foot intervals.
The final assembly, using the optional Proxim universal pole mounting kit (P/N 1087-UMK), is shown below.
Torque 50 kg-cm (3.6 lbf-ft) maximum
Cable tie