Specifications

Installation and Initialization Tsunami MP.11 5012-SUR Installation and Management
Installation Procedure
16
Installation Procedure
This section describes the steps required to install and mount the 5012-SUR. If you are already familiar with this type of
product, you can use the Quick Install Guide for streamlined installation procedures.
See the following sections:
Step 1: Choose a Location
Step 3: Mount Unit to Pole
Step 2: Attach Cables
Step 4: View LEDs/Adjust Mounting
Step 5: Close Cable Compartment
Step 6: Tighten Band Clamps/Secure Ethernet Cable
Step 7: Install Documentation and Software
NOTES:
The Configure System window provides a selectable Country field that automatically provides the allowed
bandwidth and frequencies for the selected country as well as, where applicable, Dynamic Frequency Selection
(DFS) and Transmit Power Control (TPC).
Be sure to read the Release Notes file on the product CD as it contains software version and driver information
that may not have been available when this document was produced.
Equipment is to be used with and powered by an 802.3af-compliant power injector (purchased separately).
IMPORTANT:
Before installing and using this product, see Safety and Regulatory Compliance Information on the
product CD.