Installation Manual
Table Of Contents
Tsunami Multipoint Version 1.3 Installation Guide
Optional Accessories....................................................................................................... 61
APPENDIX D. CONSTRUCTING POWER AND ETHERNET CABLES.........................................62
Subscriber Unit Power and Ethernet Cable ......................................................................... 62
Assembling the RJ45 (Woodhead) Weatherproof Connector .................................................. 64
BSU Power and Ethernet Cable ........................................................................................ 65
Installing the AMP CPC Connector with Shield and Strain Relief............................................. 69
APPENDIX E. LIGHTNING PROTECTION RECOMMENDATIONS ...........................................70
Introduction .................................................................................................................. 70
Recommendation ........................................................................................................... 71
Physical Considerations................................................................................................... 72
Where Should the Protection Units be Located? .................................................................. 73
Lightning Protection Specifications.................................................................................... 73
APPENDIX F. TECHNICAL SUPPORT AND TRAINING ...........................................................76
Figures
Figure 1. BSU Wind Loading Analysis .......................................................................................................... 9
Figure 2. SU Wind Loading Analysis............................................................................................................ 9
Figure 3. BSU Azimuth Antenna Pattern .................................................................................................... 12
Figure 4. BSU Elevation Antenna Pattern................................................................................................... 12
Figure 5. SU Antenna Pattern .................................................................................................................. 13
Figure 6. Base Station Unit Components ................................................................................................... 16
Figure 7. BSU Mounting Hardware............................................................................................................ 18
Figure 8. U-Shaped Mounting Brackets Attached ........................................................................................ 18
Figure 9. Downtilt and Clamp Brackets with Screws Attached ...................................................................... 19
Figure 10. Bracket Assembly Detail of Screw, Washers, and Nut ..................................................................19
Figure 11. Bracket Assembly Attached to Mounting Bracket......................................................................... 20
Figure 12. Screws/Clamp Bracket Assemblies Attached............................................................................... 20
Figure 13. Strap Clamps Attached and Mounted BSU .................................................................................. 21
Figure 15. BSU’s Power and Ethernet Connector ........................................................................................ 21
Figure 16. GPS Antenna Mounted on BSU.................................................................................................. 24
Figure 17. Subscriber Unit Installation Kit ................................................................................................. 31
Figure 18. Mounting Clamp Housing and U-Bolts Attached........................................................................... 32
Figure 19. Mounting Bracket Attached to SU.............................................................................................. 32
Figure 20. Mounted SU ........................................................................................................................... 33
Figure 21. SU’s Power and Ethernet Connector and Grounding Screw ........................................................... 33
Figure 22. Settings Page in Subscriber Utility............................................................................................. 35
Figure 23. Aiming Tool in Subscriber Utility ............................................................................................... 36
Figure 24. Subscriber Utility Status Window .............................................................................................. 37
Figure 25. BSU Log in the Base Station Configuration Software.................................................................... 40
Figure 26. Log 1 .................................................................................................................................... 42
Figure 27. SU Log 2 ............................................................................................................................... 43
Figure 28. BER Log in Base Station Configuration Software ......................................................................... 44
Figure 29. Password Definition/Usage Diagram .......................................................................................... 47
Figure 30. Fresnel Zones......................................................................................................................... 58
Figure 31. 8-Pin DIN and RJ45 Contact Arrangements ................................................................................ 62
Figure 32. Soldered Wires on 8-Pin DIN Connector ..................................................................................... 63
Figure 33. Metal Shell Placed Over 8-Pin DIN Connector ............................................................................. 63
Figure 34. Jacket Placed Over 8-Pin DIN Connector .................................................................................... 64
Figure 35. Cat 5 Cable with Insulation Removed ........................................................................................ 64
Figure 36. Wires Crimped into RJ45 Connector .......................................................................................... 64
Figure 37. Woodhead Cover Placed Over RJ45 Connector ............................................................................ 65
Figure 38. End Nut Seated on RJ45 Connector ........................................................................................... 65
Figure 39. 18-Pin Positronic Connector ..................................................................................................... 65
Figure 40. BSU Power and Ethernet Cable Connectors ................................................................................ 66
Figure 41. Crimping Styles and Insertion .................................................................................................. 67
Figure 42. Indoor Portion of Power and Ethernet Cable ............................................................................... 67
Figure 43. Wire Preparation..................................................................................................................... 68
Figure 44. BSU Cable Construction Tools................................................................................................... 68
Figure 45. 8-Pin AMP Connector ............................................................................................................... 69
Contents 4
CPN 63179 Issue Date: 01/24/03