Installation Manual

Tsunami Multipoint Version 1.3 Installation Guide
Chapter 2. Deploying the Base Station Unit (BSU)
This chapter describes how to mount and deploy the Base Station Unit including the GPS Antenna
(required when you install multiple BSUs at the same location).
Unpacking the System
The product’s shipping boxes should be left intact and sheltered until arrival at the installation site. If the
shipping container shows signs of damage, immediately notify the transportation company. Upon receipt,
inspect contents to make sure no parts are missing or damaged.
Proxim recommends that you retain all the packaging materials (including all internal boxes). In the
unlikely event that the equipment must be returned to the factory, use the original packing materials for
return shipment. The packaging materials are also recommended for transporting the equipment from
location to location.
Unpack the following items from the contents of the shipping box. In addition to these items, you will
require an additional Cat 5 cross-over or straight-through cable (see step 5) and a BSU power adapter
(the BSU’s power supply is ordered and shipped separately; the power supply’s CPN number is 58526).
Figure 6. Base Station Unit Components
The product’s shipping boxes should be left intact and sheltered until arrival at the installation site. If the
shipping container shows signs of damage, immediately notify the transportation company. Upon receipt,
inspect contents to make sure no parts are missing or damaged.
Chapter 2. Deploying the Base Station Unit (BSU) 16
CPN 63179 Issue Date: 01/24/03