User's Manual

Table Of Contents
Installation and Initialization
Tsunami QB-8100 Series (100 Mbps/5 Mbps Models) Installation and Management Guide 20
2.3 Installation Procedure
This section describes the procedures to install and mount the QB-8100 unit. If you are already familiar with this type of
product, you can use the Quick Install Guide for streamlined installation procedures.
NOTE: Equipment is to be used with, and powered by, the power injector provided with the product package or by a
power injector that meets the following requirements:
UL-Listed/ITE (NWGQ)
Limited Power Source Output per UL/IEC 60950
CE-marked
Approved for Power-over-Ethernet
Rated output, 48 VDC/0.40 A
See the following steps for installation instructions:
Step 1: Plan for Installation
There are several planning factors to be considered before installing the QuickBridge 8100 unit. In addition to selecting the
installation site, you should do the following:
Calculate:
Required RSL and fade margin to achieve availability objectives
Required path availability
Anticipated Multi-Path Reflection Points
Determine:
System Frequency Plan
Required Transmission Line Types and Lengths
IMPORTANT
This device must be installed by a trained professional, value added reseller, or systems integrator who is
familiar with RF planning issues and the regulatory limits.
CAUTION!
Heed all the WARNINGS. Follow all the instructions. Do not defeat the safety purpose of the grounding.
Only use attachments/accessories specified by the manufacturer.
CAUTION!
There are no user-serviceable parts inside. All services must be performed by qualified personnel.
CAUTION!
For Regulatory Information and latest product updates, including firmware and the MIBs, Proxim
recommends visiting the Proxim Support site at http://support.proxim.com