Installation Guide
7
4.
A. Cut the horizontal spacers
snuggly inside the vertical
frame channels.
D. In the bottom channel
apply two beads of
sealant the full length of
each side.
E. Place a glass block in the
side channel and slide it
into the bottom channel.
sealant behind the raised
edge of glass block.
G. Press a vertical spacer
into place next to the
block.
of sealant behind the
raised edges of the
next glass block to be
inserted.
I. Insert sealant side of
next block tight against
the vertical spacer and
of sealant behind the
raised edge of block.
C. Sealant will skin over
in 15-17 minutes. Do
not apply sealant to
more blocks than can be
installed in 10 minutes.
B. Open the sealant as
instructed on the tube.
Cut the nozzle at a 45°
4D
4F
4G
4 I