Installation Guide
6
C. Install the side channels in the same manner making sure
they are plumb before attaching with screws.
A. Placing the half channel in the top of the opening making
sure it is aligned with the side channels.
Note: Cutting the top channel in half will allow the top
row of blocks to be installed. If panel is only one or
two blocks wide, side channel will also need to be cut
in half.
D. Cut the top channel in half lengthwise with a utility knife.
Score the center groove with the knife and break the channel
in half.
2D
3B
B. Attach the channel to the opening by inserting
#
head galvanized screws through the pre-drilled holes in the
channel. Insert a screw at each end of the channel.