Installation Guide
2
All glass block panels are non-load bearing, so adequate
provisions must be made for support of construction
around the panel.
The materials required for all Seves Glass Block
installation methods are:
• Seves Glass Block for project
• Horizontal Spacers
• Vertical Spacers
• Glass Block Silicone Sealant
• Joint Finish — Grout or Silicone
•
#
6 x 1” Flat Head Galvanized or Stainless Steel Screws
horizontal spacers to make vertical spacers.
Installation Method
#
1
(Channel Construction)
also
requires:
• Perimeter Channel
• ProVantage
®
Anchors
Installation Method
#
2 (Anchor Construction) also
requires:
bucket, tile/grout sponge, and cheesecloth.
Tools required for installing the glass block are a utility
knife, screwdriver, 2-foot level, tape measure, caulk gun,
They are ProVantage
®
for 4” Premiere Series, KWiK’N
-EZ
®
for 3” Thinline Series, 80mm and MYMINIGLASS™.
Please choose the appropriate product line installation
accessories for the type of product line you are installing.