Installation Guide
11
F. Slide the half channel into place between the blocks
and the top of the opening. If necessary, temporarily
apply a piece of tape to the channel to hold it in place
until the sealant sets.
sealant to cure.
instructions to complete your project.
the second half channel.
6E
6F