Installation Guide
9
C. Install the remaining rows in this manner until you reach
the last row. Check each row for alignment vertically
and horizontally.
1. Start the row from the opposite end. For example, if
the second from right to left.
2. Continue to install blocks and vertical spacers with
sealant as illustrated.
B. Install the Second Row
5B
inside leg of the half channel at the top of the opening,
where the faces of the blocks will contact the channel.
6 A