User`s guide
128 DC 900-1317J
ADCCP NRM Programmer’s Guide
D.1 Application Sequence of Events
1. Establish a connection to a link
• Attach to the ICP
• Set buffer size (must be second command to board else error will be
received)
• Configure the link
• Start the link
• Start the station
2. Send optional commands
• Set multipoint list
• Send station init command
• Send exchange id command
• Send station reset command
• Receive station reset command
3. Send and Receive data, get reports, etc.
• Response normal ack
• Response local ack
4. Receive special error processing commands
• Response error
• Link exception packet
5. Terminate the connection
• Stop the station
• Stop the link
• Detach from the ICP