Technical data

22
Diagram 23
To replace heating water thermistor
Locate thermistor (b) clipped onto flow pipe to left hand side of sealed chamber below overheat thermostat,
see diagram 22.
Unclip thermistor from pipe.
Pull off electrical connections from thermistor.
Fit replacement thermistor in reverse order to removal.
Note: No heat sink compound is required. The polarity of the connections is not important.
To replace hot water thermistor
Pull off electrical connections from thermistor and unscrew thermistor (b) from left part of hydraulic block,
see diagram 21.
Remove gas valve module as described previously.
Fit replacement thermistor in reverse order to removal.
Note: The polarity of the connections is not important.
To replace printed circuit board (PCB)
Important: Isolate boiler from electrical supply before this operation.
Gently squeeze metal clip securing the control panel box, lift it up and hinge down.
From behind control panel box, unscrew and remove 4 screws securing PCB cover to panel.
Pull off electrical plugs from PCB.
Remove 4 screws securing PCB to panel and lift out PCB.
Fit replacement PCB in reverse order to removal.
To replace display and control panel board
Important: Isolate boiler from electrical supply before
this operation.
Remove PCB cover as described in ‘To replace PCB’.
Pull off electrical plug of display (A) from PCB, see
diagram 23.
Remove 4 screws securing PCB to panel and lift out
PCB.
Remove 4 screws securing display and control panel
bord to panel and gently lift it out.
Fit replacement display and control panel board in re-
verse order to removal.
To replace timeclock
Remove PCB cover as described in ‘To replace PCB’.
Disconnect clock electrical connections from PCB. Unclench plastic clips securing
timeclock to lower front panel and remove timeclock from panel.
Fit replacement timeclock in reverse order to removal.
To replace pressure gauge
Drain boiler as described in ‘To replace pump’.
Unclip pressure gauge clip and pull it out.
Disconnect pressure gauge cable.
Fit replacement pressure gauge in reverse order to removal.
To replace heat exchanger
Drain down heating circuit of boiler only as described previ-
ously.
Remove sealed and combustion chamber covers and side
cases as described previously.
Remove overheating termostats from heat exchanger pipes.
Pull off spring clips securing heat exchanger pipes to heat
exchanger.
Manoeuvre heat exchanger pipes down to disengage from heat
exchanger.
Remove heat exchanger by sliding forward and out of boiler.
Fit replacement heat exchanger in reverse order to removal.
Open isolating valves on flow and return connections, refill,
vent and pressurise boiler. Check for leaks.
Diagram 24