Technical data

20
Diagram 19
REPLACEMENT OF PARTS
To gain access to the boiler components, proceed as follows:
Isolate boiler from electrical supply.
Remove outer case, if necessary sealed chamber cover, combustion chamber cover and side covers, see
Routine cleaning and inspection”.
Gently squeeze metal clip securing the control panel box, lift it up and hinge down.
To replace fan
Disconnect power supply and earth leads to fan.
Supporting fan, unscrew and remove two screws secur-
ing fan to front of flue hood, see diagram 18.
Gently ease fan forwards and out of boiler.
Fit replacement fan in reverse order to removal making
sure that mounting plate engages correctly onto flue hood
Important: Ensure that fan outlet is correctly fitted into
flue elbow at top of boiler.
To replace air pressure switch
Locate air pressure switch in upper left hand corner of
sealed chamber.
Pull off clear plastic tube from base of switch.
Remove electrical connections from switch.
Unscrew and remove two screws securing switch to upper panel and remove switch
– (or unclip air pressure switch from plastic holder – depends on type of switch
used).
Fit electrical connections to replacement switch as follows:
One to the microswitch connection marked ‘NO 2’
One to the microswitch connection marked ‘COM 3’
Fit replacement switch in reverse order to removal.
Important: Refit clear plastic tube as follows:
Tube from tapping point of flue hood to switch point ‘P 2-’
To replace gas valve module
Locate gas valve module attached to side of gas valve, see diagram
19.
Unscrew screw (a) securing cover onto gas valve module.
Remove cover and disconnect multi-plug from module.
Disconnect ignition and flame sense leads from module and withdraw
module from gas valve.
Fit replacement module in reverse order to removal.
Reconnect ignition and flame sense leads, the connections are uniquely
sized to ensure correct replacement.
Refit cover ensuring all sealing grommets are correctly located in module body.
To replace gas valve
Ensure that gas supply is turned off at gas cock.
Unscrew screw (a) and remove gas valve module.
Undo nuts securing gas supply pipe between burner and gas valve and remove pipe, taking care not to lose
sealing washers, see diagram 19.
Remove gas inlet connection to boiler.
Unscrew 2 screws securing gas valve to boiler bottom.
Remove gas valve by lifting upwards and out of boiler.
Fit replacement gas valve in reverse order to removal.
Check for gas-tightness.
To replace burner
Remove burner as described in ‘Cleaning the burner’.
Fit replacement burner in reverse order to removal.
Check if the injectors are correct.
Diagram 18