Technical data
14
Diagram 10
VERTICAL FLUE INSTALLATION
• Fit gasket (E) onto underside of vertical adaptor (O) – see diagram 10.
• Carefully insert ‘O’ ring (J) into vertical adaptor inner spigot.
• Place spacer (K) on the top of boiler.
• Fit vertical adaptor (O) onto spacer (K) ensuring adaptor inner connection locates correctly onto fan out-
let.
• For flat roof installation, fit flat roof flashing collar (part no. 85107)
• Fit extension pipes (M) as required.
• For pitch roof installation, fit pitch roof flashing (part no. 85105).
• Fit flue terminal (L) onto roof ensuring flashing makes a watertight joint.
Note: Maximum vertical height with no bends is 5 m.
Should it be necessary to cut the flue, always cut equal amounts from both inner and outer pipes.
Connect condensate trap (supplied) to vertical flue adaptor when flue length exceeds 3 m.
Connect 15 mm plastic pipe (not supplied) to a suitable drain.
For vertical flue lengths up to 3 m the restrictor must be left in the fan outlet, see diagram 9.
For vertical flue lengths between 3 and 5 m, remove the restrictor (R).
For each 90° flue bend fitted, reduce overall flue height by 1 m.
For each 45° flue bend fitted, reduce overall flue height by 1/2 m.
Vertical flue terminal (black) 85103
Vertical flue terminal (brick) 85104
Pitched roof flashing 85105
Flat roof flashing 85107
Flue extension pipe 85099
90° concentric bend kit 85101
45° concentric bend kit 85102










