Specifications
Level One: Protege GX Installer Study Guide | August 2013 159
Planning the Training System
Our training scenarios are based on our fictitious client - ACME International. We will be installing an access
control system in their Texas office.
Training Scenario
Acme have provided us with a basic building plan:
Warehouse
Office
Manager
Equipment
room
From this plan, we can easily identify 3 areas:
1. Office
2. Managers Office
3. Warehouse
Looking at the entry points on our plan, and our discussions with Acme, we can determine that the two external
entry points should require a card and PIN for entry after hours. The internal doors will only require a card, and
the Office Entry Door should automatically unlock and lock based on office hours. The Warehouse should
remain secure at all times and require access control on both sides of the doors.
Door Type Internal Area Schedule
Office Entry Door Card/PIN entry, REX exit Office Office Hours
Managers Office Door Card entry, REX exit Managers Office None
Warehouse Roller Door Card/PIN entry, Card exit Warehouse None
Office to Warehouse Door Card entry, Card exit Warehouse None
To provide intruder detection, we will need the following detectors:
Office PIR
Managers Office PIR
Warehouse PIR
To provide system control, we will install a keypad in the Office.










