Specifications

PRT-WX-DIN Using Protege WX Installation and Programming Manual | June 2013
35
Overlapping Periods
Where overlapping periods are present, the schedule will take the sum of all periods.
In this example, Wednesday has two periods that overlap. The two periods are combined, and as a result, the
schedule will be valid from 9am to 3pm on Wednesday.
Rules for Schedules and Holidays
If you program times and days in to a schedule, but don't do anything else, then the schedule will always
operate.
For a holiday to prevent the schedule from becoming valid, the following must have been programmed:
1. The holiday must be programmed in a holiday group
2. That holiday group must be applied to the schedule
3. The holiday mode must be programmed as Disabled on Holiday