Specifications
PRT-CTRL-SE Protege System Controller Reference Manual | PRT-CTRL-SE 275
Period One Holiday Group
There are eight holiday groups that can be assigned to a schedule. A holiday when active will have a holiday
group(s) associated with it. If the period does not have any holiday group settings then it will not function on the
day that the holiday is valid. The process is an and process, that is if any of the holiday group options are valid
and any of the period holiday group settings are in common with the programmed value the schedule will
operate. Each option select value selects the appropriate holiday group.
SC001 P1 Hols
[--------]
To modify options, use the keypad as explained in section Entering Data Options (see page 336).
Option 1 - Holiday Group One
y Enabled the period will operate if a holiday is valid and has the group one option set.
y Disabled the period will not operate if the holiday group one is active.
Option 2 - Holiday Group Two
y Enabled the period will operate if a holiday is valid and has the group two option set.
y Disabled the period will not operate if the holiday group two is active.
Option 3 - Holiday Group Three
y Enabled the period will operate if a holiday is valid and has the group three option set.
y Disabled the period will not operate if the holiday group three is active.
Option 4 - Holiday Group Four
y Enabled the period will operate if a holiday is valid and has the group four option set.
y Disabled the period will not operate if the holiday group four is active.
Option 5 - Holiday Group Five
y Enabled the period will operate if a holiday is valid and has the group five option set.
y Disabled the period will not operate if the holiday group five is active.
Option 6 - Holiday Group Six
y Enabled the period will operate if a holiday is valid and has the group six option set.
y Disabled the period will not operate if the holiday group six is active.
Option 7 - Holiday Group Seven
y Enabled the period will operate if a holiday is valid and has the group seven option set.
y Disabled the period will not operate if the holiday group seven is active.
Option 8 - Holiday Group Eight
y Enabled the period will operate if a holiday is valid and has the group eight option set.
y Disabled the period will not operate if the holiday group eight is active.
Period Two to Period Four Configuration
Programming of period two, three and four is identical to period one.