Specifications
PRT-CTRL-SE Protege System Controller Reference Manual | PRT-CTRL-SE 257
Host Verify ID
The host verify ID is used as a security key in combination with the panel upload ID for communication with the
Protege System Management Suite. The upload and host ID keys prevent the remote connection of a Protege
System Management Suite other than that which has the same 32 bit keys.
Host verify
ID: 00000000
To modify the host verify id, use the keypad as explained in section Entering Hexadecimal Numbers (see page
335) and press [ENTER].
Module UDP Port
This is the UDP port that all Ethernet enabled modules will communicate with the Protege System Controller
over. If this port is changed all modules will need to also be changed.
Panel Options
Panel options include configuration settings that affect the test report trouble zone, login and security
parameters as well as the operation of certain panel hardware devices.
Panel Options
[-2-----8]
To modify options, use the keypad as explained in section Entering Data Options (see page 336).
Option 1 - High Current Battery Charging
y Enabled the system controller will set the charge current to 750mA.
y Disabled the system controller will set the charge current to 350mA.
Option 2 - Generate Test Report by Time of Day
y Enabled the test report trouble zone will be activated at a specific time of day. For example, if the Test
Report setting is set to 02:00 then the trouble zone will be activated at 2:00am each morning.
y Disabled the test report trouble zone will be activated periodically. For example, if the Test Report setting is
set to 00:15 then the trouble zone will be activated every 15 minutes.
Option 3 - Trouble Condition Require Acknowledge
y Enabled any trouble condition will be latched and remain active until a user logs in the keypad and
acknowledges the trouble condition.
y Disabled the system controller will automatically clear the trouble condition when the trouble has been
cleared.
Option 4 - Reserved
y Reserved do not modify
Option 5 - Generate Trouble Zone Test Report Restore
y Enabled the system controller will generate a restore event for the trouble zone test report zone restoring.
This occurs one minute after the trouble zone has been activated.
y Disabled the system controller will not generate a restore.
Option 6 - Log Zone Reference Updates
y Enabled the system controller log zone reference changes that it performs as a result of calculations that it
performs periodically to ensure a high level of system integrity.
y Disabled the system controller will not log the events.