Operation Manual

GENERAL ELECTRICAL NOTES
ALL ELECTRICAL WORK SHALL COMFORM TO THE REQUIREMENTS OF THE NATIONAL
ELECTRICAL CODE, O.S.H.A. OR APPLICABLE LOCAL AND OR STATE ORDINANCES, AS WELL
AS UTILITY COMPANY RULES REGARDING AMPERE INTERUPTION AND SAFETY SHUNT TRIP
SWITCHES AND POWER PANELS OF WHICH SHALL BEAR THE LABEL OF UNDERWRITER’S
LABORATORIES, INCORPORATED AND SHALL BE PERMANENTLY MARKED FOR EASY
IDENTIFICATION.
ALL WIRES SHALL BE SINGLE SOLID RUNS WITHOUT SPLICES MEETING THE N.E.M.A.
STANDARDS
THE ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL ALL ELECTRICAL
MATERIAL AS SPECIFIED FOR A SAFE OPERATING SYSTEM.
THE ELECTRICAL CONTRACTOR SHALL RING OUT AND TAG AND TERMINATE ALL WIRES AT
BOTH ENDS, WITH EACH RUN TO BE INSPECTED TO ENSURE THAT NO WIRES HAVE BEEN
GROUNDED OR OPEN.
THE CUSTOMER SHALL PROVIDE A DEDICATED POWER SOURCE WHEN CALLED FOR BY
PROSUN, ITS DEALERS, DISTRIBUTORS OR OTHER DESIGNATED AGENTS.
ProSun
®
, ITS DEALERS, DISTRIBUTORS OR OTHER DESIGNATED AGENTS ARE NOT
RESPONSIBLE FOR THE FINAL INSTALLATION OF THE ELECTRICAL SYSTEM. THE
RECOMMENDED ELECTRICAL PLAN MUST BE COORDINATED BETWEEN THE CUSTOMER
AND THE ELECTRICAL CONTRACTOR. ANY DEVIATION TO THE ELECTRICAL PLAN BEFORE,
DURING AND AFTER EQUIPMENT INSTALLATION IS THE RESPONSIBILITY OF THE
CUSTOMER.
THE ELECTRICAL CONTRACTOR SHALL ENSURE THE COMPLETION OF ALL ELECTRICAL
REQUIREMENTS PRIOR TO THE INSTALLATION OF ANY ProSun
®
SYSTEM.
REVISED: 11/20/01 Page 7