ProSelect Force Hot Water Oil Boiler Installation Manual

5
106346-06 - 8/19
FORCE
Installation, Operating & Service Manual
Figure 1: FORCE OIL Dimensions
1
1
2
"NPT SYSTEM RETURN
CONNECTION
19" MIN.
BURNER SWING
DOOR CLEARANCE
(FULLY OPEN)
(SEE NOTE 3)
FRONT SERVICE
CLEARANCE
(FLUEWAY CLEANING)
DRAIN VALVE
CLEAN
OUT COVER
SMOKEBOX COLLAR
COLLAR
DIA.
FLAME
OBSERVATION
PORT
BURNER
SWING
DOOR
TEMP/PRESSURE
GAUGE
RELIEF
VALVE
BECKETT AFG
BURNER
(SHOWN)
SPANNER BAR W/
ADJUSTABLE LEGS
1
1
2
"NPT SYSTEM
SUPPLY
CONNECTION
21
3
8
"
31
7
8
"
BOILER
CONTROL
NOTES:
1. THIS DIMENSION INCREASES AND IS CONTROLLED BY SMOKEPIPE ARRANGEMENT.
2. DRAIN VALVE AND RELIEF VALVE/FITTINGS SHIPPED LOOSE.
3. BOILER SHIPPED WITH STANDARD RIGHT HAND HINGE CONFIGURATION, BUT CAN
BE CONVERTED TO LEFT HAND HINGE. APPLY CLEARANCE ACCORDINGLY.
12" MIN
REAR SERVICE
CLEARANCE
(SEE NOTE 1)
13
1
4
"
20 "
3
4
5 "
3
4
SMOKEBOX
PRESURE
TAPPING
3
11
16
"
IMMERSION
WELL
1 General Information