ProSelect Force Hot Water Oil Boiler Installation Manual

23
106346-06 - 8/19
FORCE
Installation, Operating & Service Manual
Figure 13: Recommended Vent Pipe Arrangement and Chimney Requirements
Figure 14: Proper and Improper Locations of Draft Regulator
THIMBLE
CLEANOUT
DRAFT REGULATOR
DILUTION AIR
BOILER
(FRONT)
NOTE:
FIRECLAY TILE LINED CHIMNEY
ALL HORIZONTAL VENT PIPE
SHOULD SLOPE UPWARD NOT
LESS THAN ONE INCH IN
FOUR FEET.
SLOPE UP
VENT
SYSTEM
AIR GAP
APPROX.
120°
SEE
DETAIL 'A'
6 O'CLOCK
POSITION
10 O'CLOCK
POSITION
2 O'CLOCK
POSITION
RECOMMENDED SCREW LOCATIONS
FOR CHIMNEY CONNECTORS
NOT LESS THAN 8" X 8" X 15'
6 Natural Draft Venting (Chimney) (continued)