User's Manual

INDUSTRIAL 4G LTE CELLULAR ROUTER - UM V1.1.8
15
Grounding the Router
To prevent the noise and surge effect, please connect the router to the site ground wire by the
ground screw before turning on the router.
Pin Assignments
DI1/DI2 / Alarm Contacts / COM2 (RS-232) / COM3 (RS-485)