Installation Instructions

11
Adjusting the Mount and Cable Management
1. Route the cables along the arm using the cable management clip.
2. Arm tension can be adjusted by tightening or loosening the tension bolts. Do not overtighten or loosen to
the point where the bolts may come out.
Allen Wrench (1)
Tension Screw
-5˚ to 15˚
180˚
180˚
Clip