Product manual
VessRAID 1000f, 1000i, 1000s Series Product Manual
204
See “Powering On a NAS Device” on page 187.
To power off the subsystem:
1. Click the NAS Management icon at the top of the screen.
The Shutdown icon at the bottom of the screen is automatically selected.
2. Click the Power Off option button.
3. Click the OK button.
When the controller shuts down, your SmartNAVI connection is lost.
4. Wait for no less than two minutes.
5. Unplug the power cord or cords, then plug them back in, to activate the
power switches.
Monitoring the Power-Off
To monitor a power-off, you must use the Command Line Interface (CLI) though a
serial connection to the VessRAID.
See “Powering On a NAS Device” on page 187.
Shutting Down the Subsystem
You can only do part of this function in SmartNAVI. Additional action is required,
as described below.
1. Click the NAS Management icon at the top of the screen.
The Shutdown icon at the bottom of the screen is automatically selected.
2. Click the Shutdown option button.
3. Click the OK button.
Important
If you have a JBOD expansion, always power off the RAID
subsystem first. Then power off the JBOD expansion units.
Caution
After you power-off the subsystem, wait at least 10 seconds
before you power-on the subsystem again.
Important
If you have a JBOD expansion, always power-off the RAID
subsystem first. Then power-off the JBOD expansion units.