User manual
SuperTrak TX Series User Manual
108
Running Background Activities
To run a background activity from the Background Activities tab:
1. In Tree View, click the Subsystem icon.
2. From the dropdown menu on the Background Activities tab, choose one of
the following activities:
• Media Patrol – See “Running Media Patrol” on page 108
• Rebuild – See “Rebuilding a Disk Array” on page 131
• Initialization – See “Initializing a Logical Drive” on page 135
• Redundancy Check – See “Running Redundancy Check” on page 136
3. In the next screen, make the choices as requested.
4. Click the Start button.
Running Media Patrol
Media Patrol checks the magnetic media on physical drives. See “Making
Background Activity Settings” on page 107.
You can schedule Media Patrol to run automatically, see “Scheduling an Activity”
on page 108.
To run Media Patrol:
1. In Tree View, click the Subsystem icon.
2. From the dropdown menu on the Background Activities tab, choose Start
Media Patrol.
3. In the next screen, click the Start button.
Viewing Scheduled Activities
To view scheduled activities for this subsystem:
1. Click the Subsystem icon Tree View.
2. Click the Scheduler tab in Management View.
Scheduling an Activity
To set a scheduled activity for this subsystem:
1. Click the Subsystem icon Tree View.
2. From the dropdown menu on the Scheduler tab, choose Add BGA
Scheduler.
3. Click the option button of the activity you want:
• Media Patrol. See “Running Media Patrol” on page 108