User's Manual

51
Appendix A: Second I/O Module
The VTrak J610s and J310s units ship with one or two I/O modules. If your J610s
or J310s came with only one I/O module, you can upgrade by installing a second
I/O module. The following instructions describe how to install a second I/O
module.
To install a second I/O module in a VTrak J610s or J310s unit:
1. Power down the J610s or J310s unit.
2. Press the release button on the dummy I/O module, pull the handle down
and remove the dummy I/O module from the enclosure.
3. Slide the new I/O module into the slot.
4. Gently push the new I/O module all the way into the slot until the handle
locks.
5. Connect your data cables to the new I/O module.
See page 20 for more information.
6. Optional. Connect your serial cable to the second I/O module.
See page 25 for more information.
7. Power up the J610s or J310s unit.
To verify proper installation and function, run the enclosure command in the CLI.
Because the new I/O module is installed in the right slot, it will automatically take
the Standby role in the CLI screen. See page 34 for more information.