Service manual
System Maintenance Preventative Maintenance
5 - 6 0070-10-0634 Panorama® Service Manual
5.5.2 Telepack Testing
Connect the ECG leads from the Telepack to an ECG simulator.
Self Test
Insert two fresh "AA" batteries into the Telepack, following the diagram on the label on the
back of the Telepack and tighten the end cap.
The ECG Lead, Link Status, and Battery Status LEDs will illuminate for approximately five
seconds.
If the Link Status or Battery LED fails to illuminate, install new batteries.
If either LED fails to illuminate, replace the Telepack.
Telepacks (Ambulatory Transmitters)
ACTIVITY
AREA ACTION
TECHNICAL
LEVEL METHOD FREQUENCY
Buttons Test User See below Quarterly
LEDs Test User See below Quarterly
Case Inspect for
damage
Bio-Medical/
Clinical Engineer
-- Quarterly
Case Cleaning User See Operators
manual Section
11.2
Lead sets Inspect for
damage
User -- Every use
Lead Sets Cleaning User See Operators
manual Section
11.2
Equipment Racks
ACTIVITY AREA ACTION TECHNICAL LEVEL METHOD FREQUENCY
General Clean Bio-Medical/
Clinical Engineer Vacuum area Semi-Annually
Network Switches
(Fan)
Clean Bio-Medical/
Clinical Engineer
Forced air Semi-Annually,
or, as required
Cabling Inspect Bio-Medical/
Clinical Engineer
-- Annually
UPS Test Bio-Medical/
Clinical Engineer
-- Semi-Annually
Battery Replacement information
UNIT BATTERY TYPE TYPICAL LIFE
UPS Lead Acid 3 to 5 Years (normal use)
Motherboard (CMOS) Lithium Coin cell 10 Years