User manual

WebPAM User Manual
74
You can monitor Rebuild progress on the Logical Drive Rebuild tab. Click the
respective buttons to pause and resume the Rebuild.
Scheduled
To schedule a Rebuild:
1. Click on the Logical Drive View icon in Tree View.
2. Click on the Logical Drive icon of the logical drive you want to rebuild.
3. Click on the Rebuild tab in Management View.
4. Select the physical drive you want to rebuild.
Available drives have a black frame. Selected drives have a red frame.
5. Click on the Enable radio button.