Datasheet
5
Chapter 2: VessJBOD Installation
This chapter covers the following topics:
• Unpacking the VessJBOD (below)
• Mounting VessJBOD in a Rack (page 7)
• Installing Disk Drives (page 9)
• Making Data and Management Connections (page 11)
• Setting Up Serial Cable Connections (page 15)
• Connecting the Power (page 16)
• Setting up the Serial Connection (page 18)
Unpacking the VessJBOD
The VessJBOD box contains the following items:
•VessJBOD Unit
• Quick Start Guide printed
• RJ11-to-DB9 serial data cable
• Screws for disk drives
(70, including 6 spares)
• 1.5m (4.9 ft) Power cords
(1740, 1; 1840, 2)
•CD with Product Manual and Quick
Start Guide in PDF format
Warning
The electronic components within the VessJBOD enclosure are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
VessJBOD or its subassemblies.