Owner Manual
12
ISLAND HOOD PREPARATION
WHAT YOU WILL NEED
INSPECT RANGE HOOD
PREPARE DUCTWORK
Power Drill
Screwdrivers
Drill Bits
Tape Measure
Masking Tape
Pencil/Marker
Metal or Aluminum HVAC Tape
Plumb Bob/Laser Level
Scissors/Box Cutter
2x4s or Appropriate Framing Material*
• Check the contents of your box. They should include:
Range Hood
Ceiling Mounting Bracket
Hardware Bag
Chimney
Support Brackets
Transition Duct (Applies to Specific Models)
• Plug in and test controls, lights, and fan.
• Inspect for any damage caused during shipping.
• Please report any damage to Proline Customer Service within 14
days of receipt of hood by calling 877.901.5530
Plan where your ductwork will be located. Install the proper sized
ductwork and exterior roof cap, depending on where you will be
venting your hood to the exterior. Ductwork should be ready to hook
up to the range hood before beginning installation. See venting
requirements above.
* 2x4s and other additional framing material may be required if installing extra supports, or if
ceiling joists are not available in installation location
NOTE
These are general installation directions for an Island hood. Please
refer to your model’s instructional manual for specific details and other
installation options.