Owner Manual
8
WALL HOOD PREPARATION
WHAT YOU WILL NEED
INSPECT RANGE HOOD
PREPARE DUCTWORK
Power Drill
Screwdrivers
Drill Bits
Tape Measure
Masking Tape
Pencil/Marker
Metal or Aluminum HVAC Tape
Level
Wall Anchors* 
Scissors/Box Cutter
• Check the contents of your box. They should include:
  Range Hood
  Wall or Ceiling Mounting Bracket
  Hardware Bag
  Chimney (Applies to Specific Models)
  Support Brackets (Applies to Specific Models)
  Transition Duct (Applies to Specific Models)
• Plug in and test controls, lights, and fan.
• Inspect for any damage caused during shipping.
• Please report any damage to Proline Customer Service within 14 
days of receipt of hood by calling 877.901.5530
*Wall anchors will vary depending on wall material and the weight of the range hood being 
installed. They can be found at any home improvement store.
Plan where your ductwork will be located. Install the proper sized 
ductwork and exterior roof or wall cap, depending on where you will be 
venting your hood to the exterior. Ductwork should already be punched 
through the ceiling (or wall if the ceiling is not an option) and ready to 
hook up to the range hood before beginning installation. See venting 
requirements above.
NOTE
These are general installation directions for an Wall hood. Please refer 
to your model’s instructional manual for specific instructions and other 
installation options.










