User`s guide

www.projectiondesign.com
english
7
Best practice
When setting up a MIPS based projection system, it is important to keep the following
guidelines in mind:
A system is only as good as the weakest link - make sure cables, connectors,
infrastructure and IG’s are top level.
A system’s performance can almost always be improved – and there is no substitute for
experience in, and knowledge about the components in it