Datasheet
148
137
148
reserve space for the Descender Electrol.
screen casing. Install the Pre-Installation Box in the
ceiling during the rough-in stages of construction and
place the projection screen during the finishing stage.
points at the top of the box or from the sides.
Electrol will completely cover the Pre-Installation Box.
Pre-Installation Box
Edges will be invisible
after installation
Install the projection
screen at a later stage.
Easy Installation during
the rough stages
27
@
78
125
116
117
165
Screen Surface AssemblyScreen Case 2-Step Installation
1
+
2
=
Ready
case during the rough-in stages and the Screen Surface Assembly at a later
stage preventing any damage.
motor and screen surface.
the Screen Surface Assembly to the case ensuring a quick installation.
later stage ensuring optimal flexibility.
2-Step Installation Screen Case /
Screen Surface Assembly
Dimensions and
product codes
on page 68










