Operation Manual

34
progress
Connections
DUCTING VERSION AIREXHAUST SYS-
TEM
When installing the hood in ducting version, a rigid
oraexiblepipewiththediametercorresponding
totheangediameterisusedinordertoconnect
thehood totheair outletpiping.
• Fixthepipewithanadequatequantityofpipe
clamps(not supplied).
• Remove possiblecharcoallters.
RECIRCULATION VERSION AIREOUT-
LET
• Cut a hole ø 125 mm in any shelf that may
beposi-tioned overthehood.
• Insert theange 10a onthe hoodbody out-
let.
• Connect theangeto theoutleton the shelf
over the hood using a exible or rigid pipe
ø120 mm.
• Fix the pipe in position using sufcient pipe
clamps(not supplied).
• Fix thedirectionalgrille8 on the recirculation
airoutletusingthe2screws12e(2,9x12,7)
provided.
• Ensurethattheactivatedcharcoalltershave
been inserted.
ELECTRICAL CONNECTION
• Connect the hood to the mains through a
two-pole switch having a contact gap of at
least 3 mm.
• Whenopeningtheslidingcarriagefortherst
timeafterinstallingthehood,pullitoutbriskly
until it clicks.
12e
8