Installation Guide
1
2
Fig. 8Fig. 7 Fig. 9 Fig. 10
INSTALLATION INSTRUCTIONS FOR FIRE RATED APPLICATIONS USING T-BAR
1. Install No. 12 SWG Galv. Steel Hanger Wire (28) on Main Runners (29) at four corners of grid module containing
Luminaire (30). When Main Runners are spaced greater than 24 in. on center, Cross Tees (31) forming sides of grid
module containing Luminaire to be supported by Steel Hanger Wire at Cross Tee midspan.
2. Place the Luminaire (30) on the ceiling grid with the "T" Bars running through the Hanger Bar Notches (32). Fold the Hanger
Bar ends closed to engage the integral Tabs (33). Secure with pliers if necessary.
3. Install two No. 12 SWG Galv. Steel Hanger Wires (34) secured to each end of Luminaire (30) plaster frame at Lanced
Openings (35) in hanger bar support channels. Steel Hanger Wires to be installed vertically and secured to structural members
of floor or roof assembly.
4. Tighten bar hanger Locking Screws (5) in ends of Plaster
Frame (2) to prevent lateral movement of the Frame.
5. See Steps 2 through 6 on Page 1 to complete
installation.
28
29
30
31
32
33
34
35
INSTALLATION INSTRUCTIONS FOR FIRE RATED APPLICATIONS USING FURRING CHANNELS
1. Attach one Furring Channel Bracket (36) to each Hanger Bar (37) as shown in Fig. 7 and 8.
CAUTION:
Maintain a firm hold on Luminaire until Steps 2 and 3 are complete.
2. Lift Luminaire (30) to position Furring Channel Brackets over Furring Channels (38) and secure in place by bending
Tabs (39) over as shown in Fig. 9.
3. Once all Brackets are in place bend Hanger Bar End (40) around to secure Brackets to the Channels as shown in
Figure 10. NOTE:
Nailer Tab (41) should lodge under edge of Furring Channel.
4. Tighten bar hanger Locking Screws (5) in ends of Plaster Frame (2) to prevent lateral movement of the Frame.
5. Install two No. 12 SWG Galv. Steel Hanger Wires (34) secured to each end of Luminaire (30) plaster frame at Lanced
Openings (35) in hanger bar support channels. Steel Hanger Wires to be installed vertically and secured to structural members
of floor or roof assembly. (See Fig. 6)
6. See Steps 2 through 6 on Page 1 to complete installation.
36
37
36
37
39
40
Fig. 6
41
38
PAGE of
3 6
SPEC.NO.
(12/12/06)
93009333
Rev. A